Main stages of repair in the house

Main phases of repair works in the apartment.

How to begin repair of the apartment?

The very first stage of the repair work of old apartment or condos is the damage and dismantling first of all of the worn out walls and partition walls, removing the wall and ceiling coating. This phase is one of the most "filthy" stages of Visit this website the repair.

One more among the most essential and "dirty" works is the window block replacement. It is required to do this first of all due to the fact that dirt and dust will be unallowable during following phases and it is prohibited at all to open windows during painting and wallpaper works (large drops of the temperature and wetness are unallowable). After installing windows and windowsills it is essential to pack them instantly in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following stage is electrical wiring. Wiring can be set up in walls or along the flooring. Wiring is made inside the pipelines to ensure electrical safety and increase reliability. The pipeline secures wiring from external damages and allows to change the wire totally without breaking walls and flooring simply by placing the brand-new wire instead of the old one.

House Painting follows the wiring. The frequent error throughout the simultaneous conducting of such works happens when employees forget to set out among the cable televisions and house painters have actually already plastered and ravelled the wall. As an outcome, additional works are necessary to seal chases on the ended up wall. The locations of the feed switch and wall outlet place and their number must be thought-out ahead of time. The scheme of power electrical wiring is typically included into the style project.

Later on the system should be prepared to service in case of failures. In addition to the wirings, the telephone cable and the television cable are laid out. The power cable television need to not be set out near the telephone and antenna cable televisions to prevent noise pickup and disturbance. The most peculiar minute is laying out the television cable television. In order to make two (or three) TV sets in the apartment or condo the 2nd cable television is often merely "firmly soldered" in parallel, so the cable resistance is lowered. As an outcome, the display quality is degraded, lots of programs can't be received and etc. In order to avoid such circumstance it is needed to welcome an expert with unique devices. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-lasting procedure, that is why it is conducted all at once in all premises, if it is possible. Delays are related to the innovation. Each applied layer of the plaster (or filling in ending up) should dry completely before the work will continue.

Works in hygienic arrangements and the kitchen area start all at once with home painting. It is better to fulfill so-called "filthy" operate in the top place and all at once. In accordance with the strategy of the hygienic professional area welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, but radiators are not installed.

Then operates in hygienic arrangements are carried out according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following stage is putting together ceiling and laying tiles on the flooring. And at last other hygienic devices, mixers and accessories are mounted.

After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of electrical wiring are insulated and set out into rosette plates. Sockets and breakers are not set up throughout this phase in order to save their surface area appearance. The surface puttying of walls is conducted all at once. The technically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that determines wetness of the material.

image

The following stage is the process of fill. Fill can be made with different products-- from normal masonry cement-sand mixture to self-aligning floors. The advantage of the simple mix is its cheapness, the drawback is that such mix is much harder aligned at the level and the last dry time of such fill is 40 days, only then the next phase of the deal with floor can be performed, i.e. the duration is too long. Self-leveling self-aligning floorings are much more pricey, however more technological. Aligning takes place nearly "immediately" i.e. fluid service of mixture is put out, then it runs and you get the horizontal surface area. The final dry time is 15 days i.e. you have substantial time economy. The system "warm floor" is installed into the fill. If the so-called "wet processes" are inapplicable the innovation of the dry aligning (the fill innovation) is utilized bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors should take into the account density of future flooring covering. After setup the door can be taken off its hinges and got rid of until completion of repair or packed into polyethylene film to protect from damages. At the same time ceiling can be painted and the tile can be laid in that properties where it was planned. The tile must be laid on the absolutely dry overlay.

Finishing of the flooring mounting depends upon the prepared covering. Most of the times (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood gives the additional heat- and acoustic insulation. After installing of the plywood is ended up, wallpaper for painting can be pasted on walls.

In properties where finish covering of the flooring is laminated floor covering or parquet hoard, the normal wallpapers are pasted (not for painting) in the first location. Then the flooring covering is mounted.

If surface covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned repercussion is connected only with such rushing process when the terrific amount of dust is created. In spite of the fact that good flooring grinders are geared up with the vacuum cleaner, the enough amount of dust is sped up on surrounding subjects including walls. Dust is very acerbic and is badly washed off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be thought about to be completed. It is left just to install the plinths, decorative elements, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is essential to keep in mind that the sequence of works was noted in basic and can alter depending upon the guaranteed scenario-- the variety of spaces in premise, your resources, peculiarities of the building of the multilevel properties. It is based on common sense and every person efficient in analysis can separately create such a series.